Hey boys... Finally getting back to updating here. Been quite a year and this has been quite a project. By "this" I am referencing the project we started several months ago... that is moving the compound to 100% off grid. We have finally got it done. This has been expensive, but not as much as you might think. If I knew what the hell I was doing it would have been less... but I fumble through about everything, so that probably cost me 20% more... maybe, just an estimate. Our total cost right now is right at $24,000. Pay back for us should be about 7.5 years, when compared to our power bills.
We had some special requirements such as being able to run our well pump, the size of our home (2300 square feet), the distance from the panels to the house (650 feel) and the damn heat of the NC summers. Fitting perhaps that we went live with this at the peak of summer... to paraphrase my boy Frank, "If we can make it now we can make it anytime..."
We chose to go with a company called Signature Solar, out of Texas. They are relatively new, but the engineer I worked with to design the system was open to our specific circumstances. They also have a military discount. Their products seem solid, their service has been great and when not perfect, their recovery has been great. Their instructions, etc... meh, not so good. I should qualify that in that I am a total layman at any of this and even though I bug the crap out of them they still don't say (at least to my face) "Damn he is stupid"... LOL
So here is what we wound up with...
Here we have 30 400 watt solar panels... for 12000 watt capacity per day. From here in the field to the house was a 650 foot run of 8ga wire. we run these panels in series and in 2 strings, one 16 panels and one 14 panels. You can see I built my first racks on my own. The second time around I bought EG4 panel mounts also from signature solar. I am indifferent to which one was better, one day I feel like the hand built, one day I feel like the manufactures one... meh...
We of course had to trench to the house, about 1 foot (sometimes less) deep. Flat parts done with a rented trencher... the steep hill done by hand thanks to my bought and paid for 13 year old... LOL.... no pics of this one to protect the innocent... This trench included bridging over our creek... sometimes dry sometimes Class V rapids...
Those 8ga wires lead to 2 6500w inverters. At the time you had to have 2 inverters to run split phase. I understand they have created inverters now that can do this in a single inverter. We went with EG4 6500 EX. They are not the best, but they are doing the job. They have the capability to run off grid as we are doing, run as house back up in case of power failure, or to run off solar when generating enough energy and grid when there is not enough. Our goal, as you know, is to be off grid
\