ArkansasDon
Adventurist
Been working on my reloading room for a week (just finished), removed the carpeting, window, door trim & baseboards. Got rid of my old desk after 22 years, wife got me a new one.
Put in new flooring, she picked out the color, I stain matched all the new door, window trim & baseboards, sprayed on cabinet grade sanding sealer 2 coats & 3 coats of cabinet grade lacquer satin finished. Put new paint color on the accent wall. The wife will make (sew) new curtain valance, she is heading to the fabric store on her lunch hour today.
I like the way it came out. We are slowly removing all the carpeting through out the house & putting in hard surface, I have one more room left, our master bedroom 14ft x 16ft. So far I figure in the last 5 years I put in 1,760 sq ft of plank flooring,182 sq ft of floor tile.
Put in new flooring, she picked out the color, I stain matched all the new door, window trim & baseboards, sprayed on cabinet grade sanding sealer 2 coats & 3 coats of cabinet grade lacquer satin finished. Put new paint color on the accent wall. The wife will make (sew) new curtain valance, she is heading to the fabric store on her lunch hour today.
I like the way it came out. We are slowly removing all the carpeting through out the house & putting in hard surface, I have one more room left, our master bedroom 14ft x 16ft. So far I figure in the last 5 years I put in 1,760 sq ft of plank flooring,182 sq ft of floor tile.